Camytonc · OEM / ODM Cooler Bags

Cooler Bag Supplier & Manufacturer

Insulated bags built to your brand’s spec in a BSCI-certified factory. MOQ 500 pieces, full-custom production in 7-15 days.

Custom insulated cooler backpack manufactured by Camytonc
Since 2013Bag manufacturing in Yiwu, China
0+ m²Factory area
0+Workers, plus 100+ designers
0Units monthly output

Thermal engineering, stated honestly

Our cooler bags use closed-cell PE, XPE or EVA foam in 8-15 mm thicknesses, rated around R-2.5 to R-4 per inch. An aluminum PET liner cuts radiant heat by roughly 50% and can extend chilled hold times by 10-20%, depending on load, ambient temperature and how often the bag is opened.

  • Closed-cell PE / XPE / EVA foam, 8-15 mm
  • Aluminum PET reflective liner against radiant heat
  • PU/PVC coatings 3000 mm+ or TPU lamination 10,000 mm+ for waterproofing
  • Heat-welded seams, waterproof zippers and roll-top closures available

Cold-hold performance always depends on test method, ambient conditions, starting temperature, load and refrigerant quantity. We state conditions, not blanket guarantees.

Camytonc bag production line in Yiwu, China

Certifications

Our factory holds five certifications. Documentation is available on request during your due diligence.

amfori BSCI certificateamfori BSCI
ISO 9001 certificateISO 9001
SGS test reportSGS
GRS Global Recycled Standard certificateGRS
TUVCertified

From inquiry to shipment

An eight-step OEM process with stated lead times at every stage. Here are the first four; the full breakdown lives on the process page.

1-3 daysInquiry & confirmation

We confirm product, quantities, materials and target dates.

1-2 daysQuotation & contract

Itemized quote, then contract once terms are agreed.

5-7 daysSampling

Paid samples in 1-10 days depending on complexity; revisions in 2-3 days.

15-20 daysMass production

Full-custom cooler bag runs typically finish in 7-15 days.

View all 8 steps and MOQ terms

Ready to spec your cooler bag?

Send your size, quantity and artwork. We reply within 24 hours with a concrete quote and sampling plan.

Get a Quote